Full commercial reroof for Ridge Corp. The project began with the complete removal of the existing EPDM single-ply membrane and underlying ISO insulation. Two new layers of ISO board were installed to improve insulation performance and meet energy code requirements.
The roof was then covered with a durable, energy-efficient TPO single-ply membrane. To ensure long-term performance and wind resistance, the membrane was secured using advanced heat induction welding technology.